Baku Olympic Stadium Project
Located on the shore of Lake Boyuk Shor in Baku, the Baku Olympic Stadium is a multi-purpose
facility sited on a 496,000 m² plot with a seating capacity of 68,000. The project required
robust surface-water management for large plazas, circulation areas and service roads, along with
safe access solutions—while preserving the architectural quality of this landmark through a
coherent design language.
Mert Döküm supported the project with EN 124 / EN 1433 compliant systems that combine high
hydraulic capacity with heavy-duty load performance and aesthetic integration. Key products:
M121 Manhole Cover, M160 Stormwater Grating, M138 Point Drain Grating and
Mk800P Access Cover.
Standards, Performance & Project Benefits
Compliance & Materials
• EN 124 (manhole & access covers), EN 1433 (linear drainage)
• Ductile iron EN-GJS-500-7, stainless & galvanised steel
• High hydraulic capacity
• Low maintenance, long service life
Key Benefits
✅ Strength under pedestrian and vehicular traffic
✅ Secure locking & anti-slip surface
✅ Fast installation and easy access
✅ Architecturally compatible, aesthetic details